Second, water cooling equipment: (optional)

Update Time: 2018-11-20 09:37:38



Second, water cooling equipment: (optional)

The water tank can be built at the production site, and the water can be circulated by the water pump to cool the equipment. A complete set of combined cooling equipment can also be used. The FSS-200 closed circulation cooling tower is recommended to save a lot of production site space. The technical parameters of the circulating water cooling equipment are as follows:

Equipment model

FSS-200

Cooling capacity ( kcal / h )

172000

Working flow ( m 3 /h )

18-35

Working water pressure ( M p a )

0.2

Inlet and outlet pipe diameter

DN50

rated power

Main water pump ( KW )

2.2

Fan ( KW )

0.55*2

Spray pump ( KW )

0.75

Power supply ( V )

380

Host

Dimensions ( mm )

1800*1300*1200

Empty weight ( kg )

600

unit price

RMB: 

 

Third, the total price of equipment:

Power and melting equipment 128,000 yuan or 88,000 yuan, cooling water system 56,000 yuan, total: 18.4 million yuan or 144,000 yuan

Fourth, the equipment introduction:

1. The power supply adopts parallel resonant circuit, the control circuit is fully integrated, and the starting power supply adopts zero voltage soft start. The operation is very convenient, stable and reliable, long time without failure, convenient maintenance and low maintenance cost.

2 , the power supply has overvoltage, overcurrent, phase loss, undervoltage, under water pressure, cooling water temperature over limit alarm protection and other functions, safe and reliable.

3 , stable operation at the right power, fast melting speed, high production efficiency.

4 , using three-phase full-bridge rectification, low harmonics, no interference to the power grid, while the transformer does not heat, the loss is extremely low.

5 , power saving when working, water saving, small size, light weight, safe to use, a wide range of uses.

Five, heating characteristics:

1. The smelting process is stable and the casting has high mechanical strength;

2 , less oxidation loss, can achieve non-oxidative smelting, reduce melting loss;

3 , the iron liquid itself has electromagnetic stirring effect, the metal composition is uniform, can smelt various processing chips and fine scraps, reduce the cost;

4. Reduce environmental pollution;

5 , the power density is large, the melting speed is fast, and the melting is convenient;

6 , the operation is flexible and convenient, the frequency can be selected;

7. The cost of civil works is small;

8 , superb coil design, high-quality thick-walled copper tube, through the reasonable choice of the inter-turn distance of the induction coil, the induction coil has the highest conversion efficiency, the smallest resistance, more energy can be used for melting, heating, high strength, the coil is not easy to occur Damage due to arcing and expansion forces.

Sixth, installation and commissioning:

Please first construct the foundation according to our foundation and layout structure diagram, and install the furnace body and power supply according to the drawings and instructions. The materials required for the waterway and circuit are fully prepared. Our company has a special person to guide the equipment installation and is responsible for it. Commissioning, free on-site operation training.

Seven, payment method: 30% of the advance payment ; 65% before the delivery , the balance is adjusted to pay.

8. Delivery period: 30 days after the contract takes effect .

Nine, service: The whole machine is guaranteed for 12 months. Our company will provide 48- hour on-site service (except holidays) according to the needs of users .