3 tons one to two induction melting furnace casting workshop crane technical parameters
Technical parameters of metallurgical double-girder crane in one to three tons of one-to-two induction melting furnace casting workshop :
1. Lifting weight and crane model: QDY32/5-16.5m
2, work level: A7
3, lifting height: 12 meters
4, the speed of the cart: 1-45 m / min
5, car running speed: fast and slow
6, motor machine: H class
7. Motor power: 55KW for the main lift motor, 15KW for the car, 2×11KW for the big car, and 7.5KW for the car.
8. Brake: Jiaozuo Brake Factory (Golden Hoop)
9, operation mode: linkage station five gear (air operations)
10, air conditioning: Gree air conditioning
11, electrical appliances: the main components with Siemens
12, reducer: Taixing, Tailong
13, motor: Wuxi new vigorous
14, cable: Henan Rongchang Cable Factory (flat cable)
15. Driving big wheel: cast steel wheel, hook wheel cast steel wheel.
16. Steel wire rope: Nantong Steel Wire Rope Factory
17. Main lifting speed: 7.8m/min; sub-lifting speed: 15.5m/min.
18, bearing: Luoyang Bearing
2, 3 tons of one to two induction melting furnace casting workshop metallurgical double girder crane 10 tons, a total of 5 sets, technical parameters
1, lifting weight and crane model: QDY10T-22.5-16.5 meters
2, work level: A7
3, lifting height: 12 meters
4, the speed of the cart: 1-45 m / min
5, car running speed: 20 m / min
6, motor machine: H class
7, motor power: lifting 22KW, the car running 2 × 7.5 KW, the car running 2.2 KW.
8. Brake: Jiaozuo Brake Factory (Golden Hoop)
9, operation mode: linkage station five gear (air operations)
10, air conditioning: Gree air conditioning
11, electrical appliances: the main components with Siemens
12, reducer: Taixing, Tailong
13, motor: Wuxi new vigorous
14, cable: Henan Rongchang Cable Factory (flat cable)
15. Driving big wheel: cast steel wheel, hook wheel cast steel wheel.
16. Steel wire rope: Nantong Steel Wire Rope Factory
17. Lifting speed: 10.4m/min
18, bearing: Luoyang Bearing
Third, metallurgical double-girder crane 5 tons, a total of 4 sets, technical parameters.
1, lifting weight and crane model: QDY5T-22.5-16.5 meters
2, work level: A7
3, lifting height: 12 meters
4, the speed of the cart: 30 m / min
5, car running speed: 20 m / min
6, motor machine: H class
7, motor power: lifting 15KW, the car running 2 × 7.5 KW, the car running 1.5 KW.
8. Brake: Jiaozuo Brake Factory (Golden Hoop)
9, operation mode: ground operation + remote control (Taiwan Yu Ding)
10, electrical appliances: the main components with Siemens
11, reducer: Taixing, Tailong
12, motor: Wuxi new vigorous
13. Cable: Henan Rongchang Cable Factory (flat cable)
14. Steel wire rope: Nantong Steel Wire Rope Factory
15, lifting speed: 10.4m / min
16, bearing: Luoyang Bearing
4. A total of 8 electric single-girder cranes, technical parameters:
1, lifting weight and crane model: LD5T-22.5-16.5 meters
2, work level: A3
3, lifting height: 12 meters
4, the speed of the cart: 20 m / min
5, car running speed: 20 m / min
6, motor machine: F class
7, motor power: lifting 7.5KW, running 3 × 0.8 KW
8, operation mode: ground operation + remote control (Taiwan Yu Ding)
9, electrical appliances: the main components with Siemens
10. Cable: Henan Rongchang Cable Factory (flat cable)
11. Reducer: Henan Mine Crane Co., Ltd. (self-produced)
12, motor: Nanjing special motor factory main lift
13, electric hoist: Henan Mine Crane Co., Ltd. (self-produced)
14, lifting speed: 8m / min
15, bearing: Luoyang Bearing
5. Metallurgical electric single-girder crane 5 tons, a total of 5 sets, technical parameters:
1, lifting weight and crane model: LDY5T-22.5-16.5 meters
2, work level: A5
3, lifting height: 12 meters
4, the speed of the cart: 20 m / min
5, car running speed: 20 m / min
6, motor machine: F class
7, motor power: lifting 7.5KW, running 3 × 0.8 KW
8, operation mode: ground operation + remote control (Taiwan Yu Ding)
9, electrical appliances: the main components with Siemens
10. Cable: Henan Rongchang Cable Factory (flat cable)
11. Reducer: Henan Mine Crane Co., Ltd. (self-produced)
12. Motor: Nanjing Special Motor Factory
13. Driving: Henan Wuyuan Hoisting Machinery Co., Ltd. (acquisition by the mining plant)
14, electric hoist: Henan Giant Crane Co., Ltd.
15, lifting speed: 8m / min
16, bearing: Luoyang Bearing
Six, service commitment
1. The engineering boundary includes track, sliding line, procurement, installation and commissioning. Starting from the steel beam.
2. If there is a quality problem with the equipment, the supplier will send a notice to the on-site service within 24 hours after receiving the notice, and the emergency responder urgently needs to replace the supplier.
3. Party A provides a spare parts library to store spare parts to ensure normal production. The supplier sent people to Zhiqiang Company to provide convenient services.