Luoyang Songdao Induction Heating Technology

POSITION:HOME > NEWS >

0.75 T medium frequency induction furnace configuration list

Update Time: 2019-07-15 10:07:34

0.75 T medium frequency induction furnace configuration list

project

Configuration one

Aluminum shell furnace price:

Steel shell furnace price:

Configuration two

Aluminum shell furnace price:

Steel shell furnace price:

Configuration three

Aluminum shell furnace price:

Steel shell furnace price:

Configuration four

Aluminum shell furnace price:

Steel shell furnace price:

system

Jiangsu Zhenwu

Jiangsu Zhenwu

Jiangsu Zhenwu

Jiangsu Zhenwu

Transformer phase number

6 phase

6 phase

6 phase

6 phase

Voltage

380-450V

450--500V

500--550V

500--550V

Rectification

Series

Series

Series

Series

Circuit breaker switch

DW15-1200A

DW15-1200A

Zhengtai intelligent circuit breaker -1200A

German intelligent ( extracting magnetic ) circuit breaker -1200A

Line inductance

800KW 6 Zhi

1000KW 6 Zhi

Moisture-proof insulation 1000KW 6 Zhi

Moisture-proof insulation 1000KW 6 Zhi

SCR

KP

800A/1800V

12 (silicon sea)

1000A/1800V

12 (silicon sea)

1000A/2500V

12 (Sichuan Haibei Group Supervision Motorcycle Special Thyristor)

1200A/2500V

12 (Sichuan Haibei Group supervision brake thyristor)

Thyristor water cooling frame KP

13# double 6 sets

13# double 6 sets

13# double 6 sets ( import )

14# double 6 sets ( import )

Current shunt

1500A/75mv 1 only

1500A/75mv 1 only

1500A/75mv 1 only

1500A/75mv 1 only

Reactor

800KW one

800KW one

1000KW thick copper tube

1000KW thick copper tube

SCR

KK

1200A/1800 V

8 (silicon sea)

1500A/1800 V

8 (silicon sea)

800A/3500 V

16 (out of the silica sea)

1200A/3500 V

16 (out of the silica sea)

Thyristor water cooling frame KK

13# double 4 sets

14# double 4 sets

14# double 8 sets ( import )

14# double 8 sets ( import )

Electric capacitor

1.5-2000-0.5S

4 sets (Wei Wei brand)

1.6-2000-0.5S

5 sets (上虞牌)

1.9-2500-0.5S

6 sets (上虞牌)

1.9-2500-0.5S

6 sets (上虞牌)

Water cooled cable

2 260 sq.

320 square 2

400 sq. 2 (soft copper heart)

400 sq. 2 (soft copper heart)

Voltage equalizing resistor

Increase power200W10K

20 (import)

Increase power 200W10K

20 (import)

Increase power 200W10K

28 (import)

Increase power 200W10K

28 (import)

Rectifying absorbing capacitor

Domestic 0.47uf three series 12 sets

Taiwan 0.47uf three series 12 sets

US imports 0.47uf three series 12 sets

US imports 0.47uf three series 12 sets

Inverter absorption capacitor

Domestic 0.33uf three series 8 sets

Taiwan 0.33uf three series 8 sets

US imports 0.33uf three series 16 sets

US imports 0.33uf three series 16 sets

Resistor-capacitor absorption resistor

(US imports) 150W10Europe 20

(US imports) 150W10 Europe 20

(US imports) 150W10 Europe 28

(US imports) 150W10 Europe 28

Internal copper row (MM)

80*4

80*6

80*6

80*6

Inverter output copper bar(MM)

80*6

80*8

80*8

120*6

And string in bronze

80*6

80*6(

150*8

150*8

Capacitor copper row

50*3

50*4

50*4

50*4

Capacitor cooling copper tube

30*30

30*40

30*40

30*40

Aluminum shell furnace standard

Standard 0.75 tons

Standard 0.75 tons

Increase 0.75 tons

Increase the height of 0.75 tons

Steel shell furnace standard

Simple 0.75 tons

Simple 0.75 tons

Specific increase of 0.75 tons

Specific increase of 0.75 tons

Steel shell furnace water pouring device

315 shift mode or hydraulic system

431 shift mode or hydraulic system

Hydraulic system

431 shift mode or hydraulic system

Induction ring inner diameter

600

600 ( higher type double subsidized cooling tube )three in three out cooling

620 ( higher type double subsidized cooling tube ) three in three out cooling

620 ( higher type double subsidized cooling tube ) three in three out cooling

KP breakdown protection system

no

no

Have

Have

KK breakdown protection alarm system

no

no

Have

Have

KP water temperature protection system

no

no

Have

Have

KK water temperature protection system

no

no

Have

Have

 

PLC computer operating system

no

no

Already prepared port , can be modified with PLC site tracking power consumption misoperation alarm blocking

Already prepared port , can be equipped with PLC remote monitoring and tracking power consumption misoperation alarm blocking

External protection

Have

Have

Have

Have

 

Equipment high temperature alarm

Have

Have

Have

If the customer has installed PLC, remote alarm emergency stop