Luoyang Songdao Induction Heating Technology

POSITION:HOME > NEWS >

1 ton intermediate frequency melting furnace technology agreement

Update Time: 2019-12-09 10:10:40

Party A Party B commissioned the production of 1 tons IF melting furnace ( two aluminum furnace ) 1 sets the issue through friendly consultations the two sides reached the following agreement:

A, equipment composition:

KGPS-500 / 1.0 frequency power supply 1 units 

, IF capacitance cabinet Taiwan

1000KG aluminum melting furnace body (aluminum shell) set

, mechanical tilting device two sets

set of tilting furnace control box  

water-cooled cable ( standard two sets

set of water dispenser 

8. Connect set of copper bars 

, an iron mold having    two

B, 1 ton intermediate frequency melting furnace main technical parameters:

, rated power: 500KW

, rated frequency: 1000HZ

, temperature: 1600 ° C

, with overpressure, overcurrent, phase loss, water pressure and other protection functions.

, using the latest constant power control circuit.

, Party B should provide technical drawings and FIG installed base, product manual, certificate.                                         

8. Party A shall provide 10 cubic meters per hour of water source with a water pressure of 0.2 to 0.3 MPa .

, Party A should be equipped with 380V 50HZ , three-phase four-wire power supply  630KVA .

C, commissioning installation and after-sales service:

, Party B free on-site commissioning, staff responsible for the Party's free training.

, B in the process of commissioning party should actively cooperate.

, B-site installation guide Party.

, the device warranty -year B to ensure that 24 response service within hours.

D, acceptance criteria and time limit for filing an objection:

1. Party B shall conduct the acceptance within days after the on-site commissioning of Party B. If the equipment is not accepted within days, it shall be deemed as acceptance.

, during the acceptance to melt and the furnace for the period, such as melting furnace should be regarded as trouble-free acceptance.

E. This Agreement is attached to the contract. Each Party A and Party B will hold one copy. If there are any outstanding issues, the two parties will resolve the dispute through negotiation.