1 Civil construction and equipment are in place by the user.
2 The low-frequency opening and closing to the intermediate frequency power supply power transmission cable is provided by the user and connected.
3 The intermediate frequency power supply cable or copper bus of the intermediate frequency power supply to the induction heating machine is executed according to the contract , and the connection is self-care.
4 Single and double circuit circulating cooling water system pipes , valves, pumps, cooling systems, spare water tanks, etc. are provided by the user, and the installation and connection are self-care. (or by contract)
5 On-site gas system piping, etc. are provided by the user, and the installation is self-contained.
6 The control wires that enter each device are provided by the user, and we assist in the connection.