Technical information submitted when bidding for induction melting furnace project
Process and mechanical information: the main technical documents that should be provided when bidding, including but not limited to the following:
General assembly drawing of equipment and assembly drawing of each component
Consumables list, replacement cycle and life
Equipment technical specifications and performance indicators
The total weight of the induction melting furnace and the weight of each component
Electrical and control data
Control system hardware inventory
Control system software inventory;
Hardware system data in the control system;
List and instruction manual of all instruments in the automatic control system;
List and instruction manuals of all actuators in the automatic control system;
Control system network diagram and communication function description;
List of two-year spare parts;
List of bidder's information list;
Utilities information
The need for utilities
Special requirements for utilities
Technical information provided after construction
Process information:
Six main technical documents should be provided after winning the bid, including but not limited to the following:
A set of two base maps larger than A3
Engineering design drawings are also provided for two sets of CD-ROMs, provided by the bidder AUTOCADR11 / 2001, the text is provided in the WORD2003 version.
Detailed drawing of wearing parts of induction melting furnace
Assembly drawing of the induction melting furnace and assembly drawing of each component
Operation Guide
Maintenance and overhaul guidance and planning
Equipment assembly and installation instructions
Lubricant technical description and plan
Hydraulic technology description
starting program
Operating instructions
IF power supply electrical and control data
Hardware configuration diagram of PLC control system;
I / O interface diagram of PLC control system;
PLC control system control power system diagram;
Cabinet device layout and terminal wiring interconnection diagram provided by the bidder;
List of equipment and components provided by the bidder;
The power and control cable list must give the connection starting point, number, model specifications and number of cores.
Function chart of PLC control system;
Information point table of PLC control system;
PLC control software;
Configuration software and communication software for color touch-screen operator terminal;
Control system commissioning, operation manual and technical regulations;
Manuals for the use, installation, maintenance, commissioning of electrical and control equipment;
User programming manual for PLC system.
Two-year spare parts list;
List of bidder's information list;
Utilities information