3T intermediate frequency melting furnace /2000KW equipment parameters
3T intermediate frequency melting furnace /2000KW equipment parameters : ( one electric and two furnaces in parallel )
project |
Unit |
data |
Electric furnace parameters |
||
Rated Capacity |
t |
3.0 |
Maximum temperature |
°C |
1750 |
Electrical parameters |
||
Transformer primary voltage |
KV |
10 |
Transformer secondary voltage |
V |
660 |
Rated power of intermediate frequency power supply |
KW |
2000 |
working frequency |
Hz |
5 00 |
Startup success rate |
|
100% |
Power factor (under rated power state) |
% |
0.92 |
Comprehensive parameters |
||
Melting rate (cast iron national standard) |
T/h |
3.2 |
Melting power consumption (cast iron national standard) |
wh/t |
590 |
Working noise |
db |
≤85 |
Cooling water system |
||
Water supply pressure |
MPa |
0.2 — 0.3 |
Inlet water temperature |
°C |
<35℃ |
Outlet temperature |
°C |
<55℃ |