500kg Induction Melting Furnace

Update Time: 2019-12-05 09:51:04

The composition of 500kg induction melting furnace :

400kw intermediate frequency power supply - capacitor cabinet - aluminum shell or steel shell furnace - hydraulic tilting furnace system - remote control box ZXZ-40T closed loop cooling tower.

0.5吨并联中频炉.jpg

The price of 500 kg induction melting furnace

The price of the 500kg induction melting furnace is calculated according to the power of the intermediate frequency power supply and the volume of the furnace body. Different configuration prices vary. This price is for reference only. For specific prices, please contact: firstfurnace@gmail.com   

Serial number

Item name

Specification model

unit

Quantity

Price ¥

1

IF power cabinet

400KW/0.5T/1000HZ

station

1

60000

2

Filter compensation capacitor cabinet

0.75- 2 000-1S

set

1

20000

3

0.5T steelfurnace shell

GW- 0.5T

set

1

60000

4

Water cooled cable

LHSD- 300

set

2

8000

5

Model

0.5T furnace dedicated

only

2

800

Total: ¥ 148800

 

The choice of 500kg induction melting furnace related configuration

Intermediate frequencypower supply

Working form: parallel inverter structure or inverter series structure ( one electric two furnace )

Rectified form: 3- phase 6- pulse

Output power: 400kw

Power efficiency ≥98%

Start mode: buffer frequency conversion start

Startup rate: 100% (including heavy load)

Rated frequency: 500HZ - 1000HZ

AC voltage: 380v-660v

DC voltage: 500v-1000

IF voltage: 750v-1500 V

DC current: 800 A

AC current: 650 A × 2

Input frequency: 50Hz

Dimensions: 1400 mm × 90 0mm × 20 00 mm ( length × width ×height )

Weight: 10 00 KG or so

Circulating water volume: ZXZ- 40 T

Furnace body

Rated capacity: 500 KG

Maximum capacity: 60 0 KG

Power factor: ≥0.9 8

Working mode: one electric two furnace

Melting time : about 45 minutes / furnace ( 1550 degrees cast iron)

Working temperature: 1550 °C

Maximum angle of the tilting furnace: 95°

Yoke: Oriented 0.23 water yoke

Outlet mode: side outlet

Circulating water volume: ZXZ- 40 T

Tilting method: hydraulic

Unit power consumption: ≤ 620 degrees / ton ± 5% 1550 ° C

Operating voltage: 1500 V

Dimensions: 1500 × 1600 × 100 0

Weight: about 35 00KG

transformer

Rated capacity: 400 KVA

Primary voltage: 10KV

Secondary voltage: 400 V / 6 phase rectification series

One phase: 3 phase

Secondary phase number: 3 phase 6 veins

Output form: three △ three Y