E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
Induction melting furnace cooling tower winter anti-freezing measures
How to prevent the freezing of the induction melting furnace cooling tower in winter? In the absence of heat load in the closed tower, the circulating water and spray water of the pipeline will freeze due to the low ambient temperature, thus causing the heat transfer and sprinkler system to expand and be damaged, unable to work,affecting the normal operation of production. When users in the north use closed towers in winter, they must adopt practical measures to ensure the normal operation of the closed tower. Generally take the following approach:
1. Add antifreeze first. According to the ambient temperature of the place of use, according to the performance parameters of antifreeze, prepare antifreeze suitable for local meteorological characteristics. Ethylene glycol or propylene glycol is usually added to circulating water.
Note: Ethylene glycol is a colorless and slightly viscous liquid with a boiling point of 197.4 ¡ã C and a freezing point of -11.5 ¡ã C. It can be mixed with water at any ratio. After mixing, the freezing point was significantly lowered by changing the vapor pressure of the cooling water. However, the glycol antifreeze is easy to generate an acidic substance during use, and has a corrosive effect on the metal, and an appropriate amount of disodium hydrogen phosphate is added to prevent corrosion. In addition, at low temperatures, the viscosity of ethylene glycol is high, the resistance is increased, and the flow rate of the corresponding medium is reduced.
2, running the winter antifreeze mode by our company for the winter special settings. For the production task is full, basically uninterrupted production, but there is a short production interval, you can switch to the winter antifreeze mode, set the interval time and running time, the device can automatically run according to the set program. However, it should be noted that: 1 working time can not be too long; 2 to ensure that the power supply is normal; 3 to ensure sufficient amount of circulating medium in the system.
¡òInstallation
¡îThe equipment is installed in a well-ventilated, clean indoor or rainproof shed, on a level and firm foundation;
¡î Avoid places where acid gas, explosive dust, severe soot, and excessive water vapor exist;
¡îEnsure sufficient space around, the space in the upper exhaust direction should not be less than 1.5m, and the side air inlet direction should have 1m space;
¡î Prevent the air discharged from the cooling tower from being re-inhaled into the tower to prevent heat flow back;
¡îAfter being placed in the well-type wall, it should be alert to the hot and cold air returning to cause heat exhaustion failure. The special environment may consider the air intake device;
¡îWhen the indoor ventilation conditions are not good, it is recommended to add a guide air duct to take out the hot air discharged from the unit.
¡ò trial run
¡î Confirm that the direction of rotation of the circulating water pump, spray water pump and fan motor is consistent with the marking;
¡îConnect the pipeline system;
¡î Clean the water collection tank first, then refill the water to prevent the debris from being clogged. After the water is full, the float valve will automatically close;
¡î Turn on the power and pick up from the ground when wiring;
¡î Test the machine according to the product manual.