Contact
Tel:+86 13015583380
Sales hot line ( 24 hours  service):+86 13015583380

E-Mail: firstfurnace@gmail.com

whatsapp:+86 13015583380

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace principle£¨Ô­Àí£©
        

    Safety operation rules of induction melting furnace

    1. Before starting the induction melting furnace, check whether the electrical equipment, water cooling system, copper tube of the inductor, etc. are in good condition, otherwise it is forbidden to open the furnace.

    2. If the furnace melting loss exceeds the regulations, it should be repaired in time. It is strictly forbidden to smelt in a crucible that is too deep.

    3. Special personnel should be responsible for power supply and furnace opening. It is strictly forbidden to touch the sensors and cables after power supply. Those on duty are not allowed to leave their posts without authorization, and pay attention to the external conditions of the sensor and the crucible.

    4. When charging, check whether there are flammable and explosive or other harmful substances in the charge. If any, it should be removed in time. It is strictly forbidden to directly add cold and wet materials to the molten steel. After the molten liquid is filled to the upper part, it is strictly prohibited to add bulk , To prevent the cover.

    5. It is strictly forbidden to mix iron filings and iron oxide when repairing the furnace and ramming the crucible, and the ramming crucible must be dense.

    6. The pouring site and the pit in front of the furnace should be free of obstacles and no water to prevent the molten steel from falling to the ground and exploding.

    7. The molten steel is not allowed to be overfilled. When pouring the ladle with hands, the two should cooperate and walk smoothly, and no emergency stop is allowed. After pouring, the remaining steel should be poured into the designated place.

    8. The intermediate frequency power supply room of the induction melting furnace should be kept clean. It is strictly forbidden to bring flammable and explosive materials and other sundries into the room. Smoking is prohibited indoors.

     


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:+86 13015583380 Sales hot line ( 24 hours service):+86 13015583380
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan