E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
3000KW 5T induction melting furnace composition and price
(Unit: ten thousand yuan)
Serial number |
item name |
Specifications and technical parameters |
quantity |
unit price |
Total price RMB |
Main equipment part |
|||||
1 |
IF power supply cabinet (including console) |
KGPS -3000 KW /500HZ |
1 set |
29.2 |
29.2 |
3 |
Compensation capacitor cabinet |
DH /DR-3000 |
1 set |
12.6 |
12.6 |
4 |
Furnace |
GW- 5 T |
2 sets |
22.5 |
45 |
5 |
Water-cooled cable |
DH-SL-500 |
2 sets |
1.6 |
3.2 |
6 |
Hydraulic pump station system |
YY-400 |
1 set |
5.8 |
5.8 |
7 |
Tilting furnace console |
Used with GW- 5 T furnace |
1 set |
0.8 |
0.8 |
8 |
Crucible mold |
Used with GW- 5 T furnace |
2 pcs |
0.3 |
0.6 |
9 |
Water dispenser |
Used with GW- 5 T furnace |
2 sets |
0.3 |
0.6 |
10 |
Furnace lining thickness detection device |
Used with GW- 5 T furnace |
1 set |
0.8 |
0.8 |
Total main equipment : RMB |
98.6 |
||||
Supporting equipment part ( can be selected according to the actual situation on site ) |
|||||
11 |
Rectifier transformer |
ZPS-3600/10 |
1 set |
24.5 |
24.5 |
12 |
Electric water cooling system |
HICE-100 |
1 set |
9.5 |
9.5 |
13 |
Furnace water cooling system |
HICE-200 |
1 set |
15.6 |
15.6 |
14 |
Lining material |
Domestic famous brand |
2 sets |
1.0 |
2.0 |
15 |
Installation materials and labor |
Copper bars, pipes, cables, etc. |
1 set |
11.2 |
11.2 |
16 |
spare parts |
|
1 set |
1.5 |
1.5 |
18 |
Shipping fee |
Car transportation |
1 set |
1.5 |
1.5 |
19 |
Oscilloscope |
100M |
1 set |
0.8 |
0.8 |
20 |
Toolbox |
|
1 set |
0.2 |
0.2 |
twenty one |
Install foundation and civil works |
|
Full set |
10.0 |
10.0 |
Total supporting equipment part : RMB |
76.8 |