E-Mail: firstfurnace@gmail.com
whatsapp:+8618037961302
Adress: Luoxin Industrial Park, Luoyang, HenanLarge AC Motors Terminal Rings
Medium-frequency welding of mo
Medium-Frequency Brazing Equip
Integral Brazing Process for t
Online Heating Equipment for T
Online Heating Equipment for A
Aluminum ingot heating equipme
Welding Equipment for Traction
Fully Digital Medium Frequency
Motor rotor end ring brazing e
Brazing equipment for hydro ge
Generator rod induction brazin
Hydropower generator stator ba
Large diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
3000KW 5T induction melting furnace composition and price
(Unit: ten thousand yuan)
|
Serial number |
item name |
Specifications and technical parameters |
quantity |
unit price |
Total price RMB |
|
Main equipment part |
|||||
|
1 |
IF power supply cabinet (including console) |
KGPS -3000 KW /500HZ |
1 set |
29.2 |
29.2 |
|
3 |
Compensation capacitor cabinet |
DH /DR-3000 |
1 set |
12.6 |
12.6 |
|
4 |
Furnace |
GW- 5 T |
2 sets |
22.5 |
45 |
|
5 |
Water-cooled cable |
DH-SL-500 |
2 sets |
1.6 |
3.2 |
|
6 |
Hydraulic pump station system |
YY-400 |
1 set |
5.8 |
5.8 |
|
7 |
Tilting furnace console |
Used with GW- 5 T furnace |
1 set |
0.8 |
0.8 |
|
8 |
Crucible mold |
Used with GW- 5 T furnace |
2 pcs |
0.3 |
0.6 |
|
9 |
Water dispenser |
Used with GW- 5 T furnace |
2 sets |
0.3 |
0.6 |
|
10 |
Furnace lining thickness detection device |
Used with GW- 5 T furnace |
1 set |
0.8 |
0.8 |
|
Total main equipment : RMB |
98.6 |
||||
|
Supporting equipment part ( can be selected according to the actual situation on site ) |
|||||
|
11 |
Rectifier transformer |
ZPS-3600/10 |
1 set |
24.5 |
24.5 |
|
12 |
Electric water cooling system |
HICE-100 |
1 set |
9.5 |
9.5 |
|
13 |
Furnace water cooling system |
HICE-200 |
1 set |
15.6 |
15.6 |
|
14 |
Lining material |
Domestic famous brand |
2 sets |
1.0 |
2.0 |
|
15 |
Installation materials and labor |
Copper bars, pipes, cables, etc. |
1 set |
11.2 |
11.2 |
|
16 |
spare parts |
|
1 set |
1.5 |
1.5 |
|
18 |
Shipping fee |
Car transportation |
1 set |
1.5 |
1.5 |
|
19 |
Oscilloscope |
100M |
1 set |
0.8 |
0.8 |
|
20 |
Toolbox |
|
1 set |
0.2 |
0.2 |
|
twenty one |
Install foundation and civil works |
|
Full set |
10.0 |
10.0 |
|
Total supporting equipment part : RMB |
76.8 |
||||