Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Large AC Motors Terminal Rings

    Electric Motor Rotor Bars and

    Medium-frequency welding of mo

    Medium-Frequency Brazing Equip

    Integral Brazing Process for t

    Online Heating Equipment for T

    Online Heating Equipment for A

    Aluminum ingot heating equipme

    Welding Equipment for Traction

    Fully Digital Medium Frequency

    Motor rotor end ring brazing e

    Motor Rotor Guide Bar Welding

    Brazing equipment for hydro ge

    Generator rod induction brazin

    Hydropower generator stator ba

    Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Electric furnace repair(维修)
        

    Process for quickly repairing copper tube burn-through of intermediate frequency furnace inductor

     When the induction coil is severely ignited, a arc will be formed, and a severe arc will cause the copper tube to be broken at the arcing portion. In another case, after the lining is burned through, the iron overflow causes the copper platoon to burn through.   After the copper platoon is burned, the cooling water overflows and must be immediately repaired. Since the copper bars are installed in the furnace shell, the welding repair is inconvenient and needs to be removed and removed during the repair. Usually, the copper platoon repair process wastes at least one lining, which is more time consuming. Here is a sticky method for everyone to save maintenance costs.  

     For the first reason caused by the copper row burn-through, the furnace can be temporarily shut down, and the copper piece of 1 ~ 2mm thick is cut into small pieces, the area should be slightly larger than the area of the copper discharge crack, and then removed by a saw blade or a hand grinding wheel. The residue of the copper platoon is burned and cleaned with sandpaper. The FCR copper crack fast repairing agent is quickly mixed with the curing agent, and the trimmed copper sheet is stuck in the copper row cracking. After a few minutes, the FCR is solidified. The high copper bond strength can be re-opened at this time.

     

      For the second reason caused by the copper row burn-through, the repair process is as follows: tilting the furnace iron → stopping the furnace → repairing the furnace lining → copper row bonding + opening furnace. This repair process also saves a lining and a large amount of man-hours and oven power compared to conventional weld repairs.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan