E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
IF furnace opening and closing the correct manner
Cold start
The cold start process requires sufficient time for the lining material to undergo reversible expansion to seal the cracks due to thermal shock before any molten metal contacts the lining. During cold start need to use 3 to 4 K-type thermocouple temperature detector, a thermocouple need to be placed close to the furnace wall or bottom. For the intermediate frequency furnace, the temperature of the thermocouple in the middle of the effective coil is the control temperature. It is also possible to add gas combustion at the bottom of the furnace to help reduce the temperature difference between the upper part of the furnace and the entire lining.
For example, 5 tons of furnace cold start time: within 2h , the solid material in the furnace is heated to 1100 <C (heating speed: 4t ~ 15t furnace does not exceed 150 <C / h , more than 15t furnace does not exceed 100 <C / h ), and After heat preservation at 1100 <C for 3 hours,the furnace charge is quickly melted after the end of the heat preservation and put into normal use. After start with a low power transmission, power is gradually increased (full power to 20% to 30% have 15min), so that fine cracks when cooled to bridge the lining, and finally sent to full power).
Boot operation
1 ) Close the low-voltage switch box switch of the incoming line, observe whether the three-phase incoming line voltage and ammeter indication are normal, and adjust the power adjustment potentiometer to the minimum value;
2 ) Press the control power on button. After 2 to 3 seconds, press the ^main circuit switch button ̄, then press the ^inverter start button ̄, the intermediate frequency power supply starts to work. At this time, the DC voltage meter, ammeter, IF frequency meter, The power meter has instructions;
3 ) After the startup is successful, slowly adjust the power knob to the required power position and input the power; if the intermediate frequency is not established (ie, start failure) , press the ^inverter stop ̄ button to reset it, and then press ^inverter start ̄ again. can.
Shutdown operation
1 ) When stopping, first turn the power button to a smaller position, then press the ^inverter stop ̄ button.
2 ) If it takes a long time to stop, first press ^inverter stop ̄, then press the main current disconnect button, and finally press the ^control power off ̄ button. (The above steps cannot be reversed!) At this point, the internal circulating cooling water of the intermediate frequency power supply and the electric heating capacitor can be turned off (the operation of the circulating water pump is stopped), and the internal and external circulation system of the furnace should be cooled to 100 <C. In the following (generally 72hours), the pump can be stopped and the water can be stopped.
3 ) When cooling water is stopped in winter, it is necessary to consider the problem that the water in the pipeline will freeze and crack the water pipe (heating, draining water, adding water glycol, etc.).