Contact
Tel:+86 13015583380
Sales hot line ( 24 hours  service):+86 13015583380

E-Mail: firstfurnace@gmail.com

whatsapp:+86 13015583380

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace technical information£¨¼¼Êõ£©
        

    induction melting  electric furnace shutdown emergency plan



    1. Objective: To strengthen on-site technical management, standardize the operation of intermediate frequency furnace smelting, and prevent safety accidents.

    2. Phenomenon: The emergency shutdown of the induction melting  furnace is mainly caused by sudden water stoppage, power failure and furnace wear, and leakage of the furnace. Then it is the phenomenon of burnout or thyristor burnout caused by overpressure.

    3. Reasons: water stop, power outage, furnace, furnace, insurance or thyristor burnout.

    4. Hazard: 1 water stop (water stop emergency plan), 2 power outage (blackout emergency plan), 3 furnace, leak furnace will burn the induction coil, make the sensor copper pipe rupture, molten iron and cooling water contact and explode , causing major equipment accidents or casualties.

    5. Handling: 1 cut off the power supply (at the same time, the class monitor informs the dispatcher, the workshop director). 2 Close the circulating water valve to prevent the molten iron from colliding with the cooling water. 3 pour molten iron in the emergency bunker. 4 The production class assists in blowing the furnace with the air duct, so that the temperature of the furnace is lowered, and the personnel are arranged to extinguish the fire with the fire extinguisher to the bottom of the furnace. 5 Re-circulate the water, cool the coil, and place the bucket in the water seepage position of the coil to receive water.

    6. Prevention: (1) From the beginning of road construction, special personnel should be managed to ensure that each furnace lining is consistent. No debris or iron filings are allowed to enter the knot. (2) Before each feeding, carefully check the furnace lining for cracks. Perforation may lead to the phenomenon of wearing the furnace. If there is any problem, it must be treated. If there is a transverse crack in the inspection, the furnace lining must be re-barbed.

    7. Rescue measures: In the event of a leak or a furnace, the power supply of the intermediate frequency furnace control cabinet should be cut off immediately, and the molten iron should be dumped in the spare bunker in front of the furnace.

    Emergency steps: power outage---turning the furnace to the molten iron---the shift monitor informed the dispatcher and the workshop director.

     


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:+86 13015583380 Sales hot line ( 24 hours service):+86 13015583380
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan