E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
1. Medium frequency melting furnace water systems division closed and open return two forms . Closed inlet and return water of the dispenser is fixed to the furnace body, and connected at the factory tried pressure . Pipes interface It is from the main inlet , the main return pipe is directly connected to the inlet and outlet of the water inlet . The size of the water pipe is one, it can be measured , and the second can be purchased according to the parameters provided by the manufacturer . The open water is the furnace. All the influent return water branch pipes on the body are connected to the specially manufactured open water distributor . The total inflow and out of the water distributor and the main inlet and outlet steel pipes are connected with the steel pipe hard connection method .
B. Whether it is incoming backwater or open backwater ,
Water pressure ¡Ý 0.2-0.4Mpa.
Inlet water temperature < 35 ¡ãC
Effluent temperature < 55 ¡ãC
Hardness CaO < 10mg equivalent
Acid-base PH = 7-8.5
Suspended solids < 10mg/L
Water resistance > 2.5K ¦¸
Iron containing < 2 mg
1. Two sets of intermediate frequency melting furnace pumps ( one for one )
Tank volume multiplied by the total power of 0.05 to 0.06 to take . If space is limited , small pond volume when , can be added cooling towers . When the volume to ensure that , in the area south of the Yangtze River, the best additional cooling tower . North of the Yangtze River , can Not considered properly .
The water lift should be 1.5 times the distance from the water to the equipment .
Water flow rate multiplied by the total power of 0.04 to take .