E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
KGPS-0.35T-1 type induction melting furnace detailed configuration list
1. Electric cabinet:
1. Rated phase-in voltage: 380V, intermediate frequency output voltage 900V, DC current: 500A, power: 200KW
2. KK SCR 800A/1600V 4 pcs
3. KP SCR 800A/1600V 6 pcs
4. Reactor (copper pipe diameter 12mm, wall thickness 1.0mm coil, 6 pcs)
5. Constant power control system
2. Capacitor cabinet:
Capacitor 1000KF /750V 3 sets
Three, stove
Reducer: 231
Furnace shell: diameter 780 mm high 850 mm.
Induction coil: copper tube 20 mm X 30 mm X 2.5 mm inner diameter 480 mm 14 circles.
Features:
Commonly used type, fast protection speed, good starting performance, stable work and low price.
Detailed configuration list of KGPS-0.35T-2 induction melting furnace
1. Electric cabinet:
1. Rated phase-in voltage: 380V, intermediate frequency output voltage 850V, DC current: 600A, power: 300KW
2. KK SCR 800A/1600V 4 pcs
3. KP SCR 800A/1600V 6 pcs
4. Air switch 1600A
5. Installed copper bar 60mm X 6mm
6. Reactor (copper pipe diameter 12mm, wall thickness 1.2mm coil, 8 pieces)
6. Intelligent system
2. Capacitor cabinet:
Capacitor 1000KF /750V 3 sets
3. Furnace (single furnace with 2 cables)
Reducer: 231
Furnace shell: diameter 780 mm high 880 mm.
Induction coil: Copper tube 25 mm X 30 mm X 3.0 mm inner diameter 480 mm 15 circles.
Features:
1. Intelligent system, fast protection speed, durable thyristor, good starting performance, stable work and convenient operation.
2. Adopt large copper row installed machine, increase reactor (for 0.5T electric furnace), and save electricity.