E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
Overhaul of induction melting furnace
1. Preparations for overhaul
1. Personnel preparation: Party B will arrange technical personnel to be responsible for the removal of the periphery of the equipment capacitor cabinet, and Party A will arrange relevant personnel to cooperate to ensure that the reserved part of the equipment does not appear to be damaged again.
2. Demolition tooling and equipment: Party A provides relevant demolition tools, lifting equipment and protective equipment, and Party B arranges vehicles to transport the intermediate frequency capacitor cabinet to Party B¡¯s factory for complete disassembly and overhaul.
3. Removal location: Party A will cut off the power to the high voltage end of the equipment according to the procedure, and then under the guidance of Party B¡¯s technicians, Party A¡¯s personnel will cooperate with the 575V incoming busbar, the equipment¡¯s internal circulating water inlet and outlet ports, and the equipment¡¯s output DC Removal of busbars, equipment output intermediate frequency busbars, equipment foundation bolts, and peripheral low-voltage electrical equipment.
4. Time required: A total of two days. Party A must complete the peripheral power and water cut of the equipment within 4 hours, and Party A shall cooperate with Party B to remove the designated location of the equipment within 4 hours. Party A cooperates with Party B to complete the truck loading work within 8 hours.
2. Items that must be replaced for overhaul
1. Replace one capacitor cabinet as a whole
2. 6 new electric heating capacitors
3. 6 rectifier thyristors
4. 8 inverter thyristors
5. 2 pairs of capacitor copper row brackets
6. 1 main control board
7. Capacitor bus copper bar processing 4 meters
8. 1 batch of control system circuit materials
9. 1 intermediate frequency transformer
10. 1 intermediate frequency current transformer
11. 4 commutation inductors
12. Control 3 current transformers
13. 1 control transformer
14. 1 power transformer
15. 2 sets of capacitor water separators
16. 1 water pressure relay
17. 1 batch of capacitor cabinet water pipes and accessories
18. The capacitor is connected to the busbar 4 meters
19. 1 batch of internal waterway materials of the power supply
20. 2 sets of furnace coil insulation treatment
21. Replace 10 furnace insulation columns
22. Maintenance of 4 furnace water-cooled cables
23. Replace 2 sets of furnace soft water pipes
24. 2 sets of furnace water pressure and water temperature protection and repair
3. Overhaul maintenance, testing, and free and guidance items
1. Control system circuit design and construction
2. 8 inverter thyristors
3. 2 combined thyristor racks
4. Design and construction of other components of the power supply
5. 3 power frequency current transformers
6. 3 power frequency display instruments
7. 2 DC display instruments
8. 3 IF display instruments
9. 1 DC sampling shunt
10. Design and construction of the internal waterway of the power supply
11. Repair 3 pieces of damaged yoke of No. 1 furnace
12. Guided maintenance of transformer secondary bus
13. Guided maintenance of the main output bus
14. Guided maintenance of water-cooled bus
15. Layout and installation of the new capacitor cabinet after the original capacitor cabinet is shifted
16. Capacitor waterway design guidance and installation
17. Guide the installation of capacitor components
18. Guided maintenance of the main external circulation pipeline
19. Hydraulic device testing
20. Guiding and correcting the shape of the furnace body
21. The induction coil guides the descaling
22. Equipment on-site installation guidance
23. On-site debugging of equipment
24. Static knife switch (free)
25. Automatic air switch (free)
26. Guided repair of the yoke fixing bracket of the first and second furnaces (free) 1
27. One set of safety insulation guidance at the operation site (free of charge)
28. 4 commutation inductors (free)
29. Other maintenance items
4. Equipment installation and commissioning
1. Non-Party B's scope of supply:
Public facilities such as water, electricity and gas supply;
Equipment foundation, including all anchor bolts and embedded pipe fittings;
Mounting iron and installation material foundation cover plate;
Pipes, wires and installation materials between electrical equipment;
Water supply, drainage, compressed air pipes, etc. between external and individual equipment.
2. Technical data delivered by Party B:
Drawings for equipment maintenance;
List of vulnerable parts of equipment;
System schematic diagram;
Operation and maintenance manual.
3. Technical services provided by Party B:
During the equipment commissioning process, Party A arranges relevant technical personnel to cooperate with the commissioning, and Party B¡¯s technical personnel conduct on-site training for Party A¡¯s personnel during the commissioning process;
After the equipment commissioning is completed, Party B shall conduct specific trainings for relevant personnel of Party A on equipment electrical design principles, equipment maintenance essentials, equipment safety matters, etc.;
Party A will provide permanent technical consulting services within and outside the contract period;
Party B provides free supply of damaged spare parts during the contract period, and supplies spare parts for equipment at the lowest market price outside the contract period.
4. Construction plan:
The intermediate frequency capacitor cabinet is completely dismantled and overhauled at Party B¡¯s factory. Party A can send personnel to inspect and learn on site
5. Overhaul warranty and quotation
There are many replacement projects in this overhaul, high overhaul technical requirements, tight construction period requirements, combined with materials and working hours turnover, etc.
factor
6. Performance indicators after the equipment overhaul is completed
After the equipment overhaul is completed, the production and operation status of the induction melting furnace capacitor cabinet meets the design requirements of the induction melting furnace capacitor cabinet in the new anode workshop; and the electrical equipment can be interchanged, and the production operation status of the induction melting furnace reaches 90% of the original equipment delivery performance above.
Seven, other
This agreement is a technical appendix of the contract, and the unmentioned matters shall be resolved through mutual negotiation by both parties.