E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
Induction melting furnace often burns inverter thyristor maintenance points
1) Failure phenomenon: Induction melting furnace failures are mostly concentrated in the burning of components caused by large current and large voltage out of control.
2) Reason analysis:
2-1. High voltage out of control: When the intermediate frequency voltage of the induction melting furnace rises to a certain value, the inverter will be overturned and cannot operate under high impedance; the withstand voltage of the components is reduced or the cooling effect is not good, and the insulation performance of the system is reduced ; When the intermediate frequency voltage of the induction melting furnace rises, the machine is short-circuited to the ground, check the intermediate frequency capacitor and the furnace; interference may also be caused, the inverter trigger line should be far away from the main circuit.
2-2. The large current is out of control, the back pressure angle of the intermediate frequency voltage is too small, whether the trigger circuit has poor contact, and also pay attention to the consistency of the off time. To
Now that most of the quality of domestic components have passed the test, if the workmanship is good, the reliability is already very high. Inverter thyristors are relatively weak devices in induction melting furnace systems. If it is damaged frequently, it will not only cost money to buy frequently, but also affect normal production and delay the construction period. Once this failure occurs, you should pay attention to it, check the cause, and repair it normally. Refer to the