





E-Mail: firstfurnace@gmail.com
whatsapp:+8618037961302
Adress: Luoxin Industrial Park, Luoyang, HenanLarge AC Motors Terminal Rings
Medium-frequency welding of mo
Medium-Frequency Brazing Equip
Integral Brazing Process for t
Online Heating Equipment for T
Online Heating Equipment for A
Aluminum ingot heating equipme
Welding Equipment for Traction
Fully Digital Medium Frequency
Motor rotor end ring brazing e
Brazing equipment for hydro ge
Generator rod induction brazin
Hydropower generator stator ba
Large diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
Inspection and removal method of scale on water nozzle of metal melting furnace
In the intermediate frequency power cabinet of the metal melting furnace, the thyristor water-cooled radiator is connected to the negative electrode conductor. The water nozzle of the water-cooled radiator easily absorbs the positively charged conductive ions to form scale. Therefore, when removing the scale, check the connection to the negative electrode. The water-cooled radiator tap of the water-cooled radiator, after loosening the water clip, you can clearly see that there is a large amount of scale on the tap. Use a sharp tool to clean the scale out. This work should be done every 3 months. Just do it once.
For the faucet of the water-cooled radiator connected to the positive electrode, the cleaning time can be extended appropriately, but it should be checked frequently to prevent it from being blocked for a long time. The faucet connected to AC power is not easy to form scale, but it should be opened regularly for inspection.































