Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Large AC Motors Terminal Rings

    Electric Motor Rotor Bars and

    Medium-frequency welding of mo

    Medium-Frequency Brazing Equip

    Integral Brazing Process for t

    Online Heating Equipment for T

    Online Heating Equipment for A

    Aluminum ingot heating equipme

    Welding Equipment for Traction

    Fully Digital Medium Frequency

    Motor rotor end ring brazing e

    Motor Rotor Guide Bar Welding

    Brazing equipment for hydro ge

    Generator rod induction brazin

    Hydropower generator stator ba

    Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Induction Heating Related Products(相关产品)
        

    Inspection and removal method of scale on water nozzle of metal melting furnace

    In the intermediate frequency power cabinet of the metal melting furnace, the thyristor water-cooled radiator is connected to the negative electrode conductor. The water nozzle of the water-cooled radiator easily absorbs the positively charged conductive ions to form scale. Therefore, when removing the scale, check the connection to the negative electrode. The water-cooled radiator tap of the water-cooled radiator, after loosening the water clip, you can clearly see that there is a large amount of scale on the tap. Use a sharp tool to clean the scale out. This work should be done every 3 months. Just do it once.

    For the faucet of the water-cooled radiator connected to the positive electrode, the cleaning time can be extended appropriately, but it should be checked frequently to prevent it from being blocked for a long time. The faucet connected to AC power is not easy to form scale, but it should be opened regularly for inspection.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan