E-Mail: firstfurnace@gmail.com
whatsapp:+8618037961302
Adress: Luoxin Industrial Park, Luoyang, HenanLarge AC Motors Terminal Rings
Medium-frequency welding of mo
Medium-Frequency Brazing Equip
Integral Brazing Process for t
Online Heating Equipment for T
Online Heating Equipment for A
Aluminum ingot heating equipme
Welding Equipment for Traction
Fully Digital Medium Frequency
Motor rotor end ring brazing e
Brazing equipment for hydro ge
Generator rod induction brazin
Hydropower generator stator ba
Large diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 

Intermediate frequency heating furnace

1. Fully automatic medium frequency induction heating complete equipment, with vibration sorting, idler feeding, automatic temperature control and three temperature control inspection functions, 5000KW/1.5KHz steel pipe online heating equipment provided by Anshan Iron and Steel Group Co., Ltd. Wait. It has been used continuously for more than two years, and it is very reliable and users respond well.
1. Equipment range is shown in the table below
|
Serial number |
content |
Quantity |
Remarks |
|
|
1 |
Medium frequency power supply KGPS- 120 0 kw / 0.6KHZ |
2 sets |
|
|
|
Capacitor bank |
1 set |
|
||
|
Water cooled cable 400mm 2 |
4 roots |
|
||
|
2 |
Medium frequency power supply KGPS- 700kw / 1.5KHZ |
2 sets |
|
|
|
Capacitor bank |
1 set |
|
||
|
Water cooled cable 315mm 2 |
4 roots |
|
||
|
3 |
Medium frequency power supply KGPS- 400kw / 1.35KHZ |
1 set |
|
|
|
Capacitor bank |
1 set |
|
||
|
Water cooled cable 315mm 2 |
2 roots |
|
||
|
4 |
IF power KGPS- 500kw / 3KHZ |
2 sets |
|
|
|
Capacitor bank |
1 set |
|
||
|
Water cooled cable 400mm 2 |
2 roots |
|
||
|
5 |
Medium frequency power supply KGPS- 500kw / 1.5KHZ |
1 set |
|
|
|
Capacitor bank |
1 set |
|
||
|
Water cooled cable 400mm 2 |
2 roots |
|
||
|
6 Optional item |
Temperature control system (infrared temperature measurement and control instrument) |
1 set |
PLC center console |
|
|
6 .1 |
PLC center console |
1 set |
|
|
|
6.2 |
PLC S7 -200 |
1 set |
|
|
|
6 . 3 |
Industrial LCD screen |
1 set |
|
|
|
6.4 |
Double colorimetric infrared thermometer |
1 set |
|
|
|
6 . 5 |
Photoelectric alarm switch |
1 set |
|
|
|
6 . 6 |
Control cabinet |
1 set |
|
|
|
6 . 7 |
Console |
1 set |
|
|
|
A, comprehensive parameters |
||
|
Serial number |
project |
Parameter requirement |
|
1 |
Power supply |
1 200kw / 3 phase 6 veins |
|
2 |
Number of rectifiers |
6 veins |
|
3 |
Inverter |
SCR inverter |
|
4 |
Rated frequency |
600 Hz |
|
5 |
Line voltage |
380V |
|
6 |
IF voltage |
160 0V |
|
7 |
Start success rate |
100% |
|
8 |
Power factor |
Greater than 0.9 2 |
|
9 |
Outlet heating temperature |
1 15 0<C |
|
10 |
Heating power consumption |
+3 4 0\ 5 % kW.h/t |
|
B. Heat exchange cooling water system parameters |
||
|
Serial number |
project |
parameter |
|
1 |
Inlet pressure |
0.2-0.4MPa |
|
2 |
Inlet temperature |
5-35 < C |
|
3 |
Effluent temperature |
<55<C |