





E-Mail: firstfurnace@gmail.com
whatsapp:+8618037961302
Adress: Luoxin Industrial Park, Luoyang, HenanLarge AC Motors Terminal Rings
Medium-frequency welding of mo
Medium-Frequency Brazing Equip
Integral Brazing Process for t
Online Heating Equipment for T
Online Heating Equipment for A
Aluminum ingot heating equipme
Welding Equipment for Traction
Fully Digital Medium Frequency
Motor rotor end ring brazing e
Brazing equipment for hydro ge
Generator rod induction brazin
Hydropower generator stator ba
Large diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 

R4.5 m two-machine two-flow curved continuous casting machine
R4.5 m two-machine two-flow curved continuous casting machine
Original parameters: Billet: 80 square, 100 square Billet speed: 3~3.5m/min Billet length: 6 meters
|
name |
Quantity |
Specifications / dimensions |
remark |
|
|
|
主 机 设 备 |
1)Crystallizer |
2set |
Narrow water seam, tubular |
80 parties, 100 parties One each |
|
|
2)Crystallizer vibration device |
2set |
Half plate spring, outer arc drive |
Frequency |
|
|
|
3)R4.5 meter curved roller table |
2set |
Monolithic, water-cooled |
|
|
|
|
4)Steel billet cooling sprinkler system |
2set |
Water spray |
|
|
|
|
5) Five-roller straightening machine |
2set |
Double hydraulic cylinder, double motor |
Frequency |
|
|
|
6)Double hydraulic cylinder, double motor |
2set |
Free roll |
About 2.5 meters long |
|
|
|
7)Conveyor roller |
2sets |
Concentrated chain drive |
The liquid is about 11 meters long |
|
|
|
8)Lead rod storage device |
Hydraulic flip |
||||
|
9)Lead rod |
2 pieces |
Flexible spindle |
|
|
|
|
10)Main frame |
1set |
Two streams |
|
|
|
|
11)Main engine hydraulic system |
1set |
Two streams apply |
Without intermediate piping Cable and bridge free |
|
|
|
12)Host electrical control system |
1set |
Two streams apply |
|
||
|
Auxiliary equipment |
1)Intermediate tank shell |
3pieces |
1 stream is applicable |
|
|
|
2)Medial endometrium |
1set |
1 stream is applicable |
|
||
|
3)Blanking roller |
1set |
Suitable for 6 m billet |
|
|
|
|
4)Pusher |
|
||||
|
5)Cold bed |
1set |
Single side cooling bed |
|
|
|
|
6)The pump system includes motor, water pump, starter cabinet, valve, no supply, return pipe |
2 |
55KW single stage centrifugal pump |
1 motor/pump |
|
|
|
Configuration upgrade |
1)Automatic water distribution |
1set |
2 stream |
|
|
|
2)PLC automatic control + hydraulic system upgrade |
1set |
2 stream |
With industrial computer and screen |
|
|
|
User responsible |
1)Steel structure |
set |
|
Provide drawings |
|
|
2)Civil engineering |
set |
|
Provide drawings |
|
|
Description:
(1) The above is the preliminary quotation, and the final price is adjusted after the equipment selection is determined. The quotation does not include pipelines.
(2) If the foreign power parameters are inconsistent with China, additional conversion fees will be added, and the amount will be agreed upon according to the specific data.
(3) The seller shall send a technician to guide the installation at the user's site, and the user shall be responsible for the round-trip, room and board expenses; the foreign project buyer shall be responsible for the procedures and expenses for going abroad, and each person shall be charged an additional US$100 per day.































