Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Large AC Motors Terminal Rings

    Electric Motor Rotor Bars and

    Medium-frequency welding of mo

    Medium-Frequency Brazing Equip

    Integral Brazing Process for t

    Online Heating Equipment for T

    Online Heating Equipment for A

    Aluminum ingot heating equipme

    Welding Equipment for Traction

    Fully Digital Medium Frequency

    Motor rotor end ring brazing e

    Motor Rotor Guide Bar Welding

    Brazing equipment for hydro ge

    Generator rod induction brazin

    Hydropower generator stator ba

    Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Electric furnace industry news(电炉新闻)
        

    Intermediate frequency melting furnace considerations

     

    1. Check whether the electrical equipment, water cooling system, and sensor copper pipes are in good condition before opening the furnace. Otherwise, it is forbidden to open the furnace.

    2. If the furnace melt loss exceeds the regulations, it should be repaired in time. It is strictly forbidden to smelt in the melted deep shovel.

    3. There should be someone responsible for power transmission and furnace opening. It is strictly forbidden to touch the sensor and cable after power transmission. The shifter must not leave the post without permission, pay attention to the sensor and the external situation.

     

    4. When loading, check whether there are any inflammable, explosive and other harmful substances in the charge. If it should be removed in time, it is forbidden to directly add cold and wet materials to the molten steel. After the molten liquid is filled to the upper part, it is strictly forbidden to add large blocks. To prevent the cover.

    5. It is strictly forbidden to mix iron filings and iron oxides when making furnaces and simmering sputum.

    6. The pouring site and the pit in front of the furnace should be free of obstacles and no water to prevent the molten steel from falling to the ground.

    7. The molten steel is not allowed to be overfilled. When the hand is raised and poured, the two should cooperate with each other. The walk should be stable. Do not rush to stop. After pouring, the surplus steel should be poured into the designated place.

    8. The medium frequency generator room should be kept clean. It is forbidden to bring inflammable and explosive materials and other sundries into the room. No smoking indoors.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan