Contact
Tel:+86 13015583380
Sales hot line ( 24 hours  service):+86 13015583380

E-Mail: firstfurnace@gmail.com

whatsapp:+86 13015583380

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Industrial electric furnace technical information
        

    3 tons one to two induction melting furnace casting workshop crane technical parameters

    Technical parameters of metallurgical double-girder crane in one to three tons of one-to-two induction melting furnace casting workshop :

    1. Lifting weight and crane model: QDY32/5-16.5m

    2, work level: A7

    3, lifting height: 12 meters

    4, the speed of the cart: 1-45 m / min

    5, car running speed: fast and slow

    6, motor machine: H class

    7. Motor power: 55KW for the main lift motor, 15KW for the car, 2〜11KW for the big car, and 7.5KW for the car.

    8. Brake: Jiaozuo Brake Factory (Golden Hoop)

    9, operation mode: linkage station five gear (air operations)

    10, air conditioning: Gree air conditioning

    11, electrical appliances: the main components with Siemens

    12, reducer: Taixing, Tailong

    13, motor: Wuxi new vigorous

    14, cable: Henan Rongchang Cable Factory (flat cable)

    15. Driving big wheel: cast steel wheel, hook wheel cast steel wheel.

    16. Steel wire rope: Nantong Steel Wire Rope Factory

    17. Main lifting speed: 7.8m/min; sub-lifting speed: 15.5m/min.

    18, bearing: Luoyang Bearing

    2, 3 tons of one to two induction melting furnace casting workshop metallurgical double girder crane 10 tons, a total of 5 sets, technical parameters

    1, lifting weight and crane model: QDY10T-22.5-16.5 meters

    2, work level: A7

    3, lifting height: 12 meters

    4, the speed of the cart: 1-45 m / min

    5, car running speed: 20 m / min

    6, motor machine: H class

    7, motor power: lifting 22KW, the car running 2 〜 7.5 KW, the car running 2.2 KW.

    8. Brake: Jiaozuo Brake Factory (Golden Hoop)

    9, operation mode: linkage station five gear (air operations)

    10, air conditioning: Gree air conditioning

    11, electrical appliances: the main components with Siemens

    12, reducer: Taixing, Tailong

    13, motor: Wuxi new vigorous

    14, cable: Henan Rongchang Cable Factory (flat cable)

    15. Driving big wheel: cast steel wheel, hook wheel cast steel wheel.

    16. Steel wire rope: Nantong Steel Wire Rope Factory

    17. Lifting speed: 10.4m/min

    18, bearing: Luoyang Bearing

    Third, metallurgical double-girder crane 5 tons, a total of 4 sets, technical parameters.

    1, lifting weight and crane model: QDY5T-22.5-16.5 meters

    2, work level: A7

    3, lifting height: 12 meters

    4, the speed of the cart: 30 m / min

    5, car running speed: 20 m / min

    6, motor machine: H class

    7, motor power: lifting 15KW, the car running 2 〜 7.5 KW, the car running 1.5 KW.

    8. Brake: Jiaozuo Brake Factory (Golden Hoop)

    9, operation mode: ground operation + remote control (Taiwan Yu Ding)

    10, electrical appliances: the main components with Siemens

    11, reducer: Taixing, Tailong

    12, motor: Wuxi new vigorous

    13. Cable: Henan Rongchang Cable Factory (flat cable)

    14. Steel wire rope: Nantong Steel Wire Rope Factory

    15, lifting speed: 10.4m / min

    16, bearing: Luoyang Bearing

    4. A total of 8 electric single-girder cranes, technical parameters:

    1, lifting weight and crane model: LD5T-22.5-16.5 meters

    2, work level: A3

    3, lifting height: 12 meters

    4, the speed of the cart: 20 m / min

    5, car running speed: 20 m / min

    6, motor machine: F class

    7, motor power: lifting 7.5KW, running 3 〜 0.8 KW

    8, operation mode: ground operation + remote control (Taiwan Yu Ding)

    9, electrical appliances: the main components with Siemens

    10. Cable: Henan Rongchang Cable Factory (flat cable)

    11. Reducer: Henan Mine Crane Co., Ltd. (self-produced)

    12, motor: Nanjing special motor factory main lift

    13, electric hoist: Henan Mine Crane Co., Ltd. (self-produced)

    14, lifting speed: 8m / min

    15, bearing: Luoyang Bearing

    5. Metallurgical electric single-girder crane 5 tons, a total of 5 sets, technical parameters:

    1, lifting weight and crane model: LDY5T-22.5-16.5 meters

    2, work level: A5

    3, lifting height: 12 meters

    4, the speed of the cart: 20 m / min

    5, car running speed: 20 m / min

    6, motor machine: F class

    7, motor power: lifting 7.5KW, running 3 〜 0.8 KW

    8, operation mode: ground operation + remote control (Taiwan Yu Ding)

    9, electrical appliances: the main components with Siemens

    10. Cable: Henan Rongchang Cable Factory (flat cable)

    11. Reducer: Henan Mine Crane Co., Ltd. (self-produced)

    12. Motor: Nanjing Special Motor Factory

    13. Driving: Henan Wuyuan Hoisting Machinery Co., Ltd. (acquisition by the mining plant)

    14, electric hoist: Henan Giant Crane Co., Ltd.

    15, lifting speed: 8m / min

    16, bearing: Luoyang Bearing

    Six, service commitment

    1. The engineering boundary includes track, sliding line, procurement, installation and commissioning. Starting from the steel beam.

    2. If there is a quality problem with the equipment, the supplier will send a notice to the on-site service within 24 hours after receiving the notice, and the emergency responder urgently needs to replace the supplier.

    3. Party A provides a spare parts library to store spare parts to ensure normal production. The supplier sent people to Zhiqiang Company to provide convenient services.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:+86 13015583380 Sales hot line ( 24 hours service):+86 13015583380
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan