E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
When the muffle furnace is used for the first time or is used again after a long period of inactivity, it must be baked. The oven time should be 200¡ãC to 600¡ãC for four hours. When in use, the maximum furnace temperature must not exceed the rated temperature, so as not to burn the heating element. It is forbidden to pour various liquids and easily soluble metals into the furnace. The muffle furnace is best to work below the maximum temperature of 50 ¡æ, when the furnace wire has a longer life.