E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
Detailed introduction about cleaning of tube laboratory furnace
Tube type experimental furnace cleaning plan:
The tube-type experimental furnace is a literary meaning. It is mainly used for experiments, and is mostly used for quantitative analysis of sintering and ashing experiments; it is a kind of batch-type resistance furnace, but it does not mean that the batch-type electric furnace is a tube-type experimental furnace. The gas burner needs to be cleaned with kerosene before carburizing.
Second, the furnace tank of the tube-type experimental furnace is cleaned once a week during continuous production, and the cleaning of the intermittent production furnace should be carried out immediately after the furnace is shut down.
Third, when the cleaning temperature of the furnace tank is 850¡«870¡æ, all the chassis should be taken out.
Fourth, when using compressed air nozzles to blow in from the feed end of the tube-type experimental furnace, the valve should not be opened too much, and it should be moved back and forth to avoid partial overheating.
Remind you the precautions when using the tube-type experimental furnace: always pay attention to the burning situation and gas pressure in each area; do not stand by the side when the furnace door is opened to prevent the flame from erupting and burn; pay attention to whether the incinerator nozzle in the department is burned and used torches Check whether the wedge-shaped door is leaking; when the flame of the incinerator is found to have subsided during work, the gas valve should be closed immediately, and then the air valve should be closed; when the tube-type experimental furnace is working, the parts should be dropped or the wedge-shaped door switch should be stopped, and the feed should be stopped. Take out the parts.