Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Large AC Motors Terminal Rings

    Electric Motor Rotor Bars and

    Medium-frequency welding of mo

    Medium-Frequency Brazing Equip

    Integral Brazing Process for t

    Online Heating Equipment for T

    Online Heating Equipment for A

    Aluminum ingot heating equipme

    Welding Equipment for Traction

    Fully Digital Medium Frequency

    Motor rotor end ring brazing e

    Motor Rotor Guide Bar Welding

    Brazing equipment for hydro ge

    Generator rod induction brazin

    Hydropower generator stator ba

    Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Induction Heating Related Products(相关产品)
        

    Detailed introduction about cleaning of tube laboratory furnace

    Tube type experimental furnace cleaning plan:

    The tube-type experimental furnace is a literary meaning. It is mainly used for experiments, and is mostly used for quantitative analysis of sintering and ashing experiments; it is a kind of batch-type resistance furnace, but it does not mean that the batch-type electric furnace is a tube-type experimental furnace. The gas burner needs to be cleaned with kerosene before carburizing.

    Second, the furnace tank of the tube-type experimental furnace is cleaned once a week during continuous production, and the cleaning of the intermittent production furnace should be carried out immediately after the furnace is shut down.

    Third, when the cleaning temperature of the furnace tank is 850~870℃, all the chassis should be taken out.

    Fourth, when using compressed air nozzles to blow in from the feed end of the tube-type experimental furnace, the valve should not be opened too much, and it should be moved back and forth to avoid partial overheating.

    Remind you the precautions when using the tube-type experimental furnace: always pay attention to the burning situation and gas pressure in each area; do not stand by the side when the furnace door is opened to prevent the flame from erupting and burn; pay attention to whether the incinerator nozzle in the department is burned and used torches Check whether the wedge-shaped door is leaking; when the flame of the incinerator is found to have subsided during work, the gas valve should be closed immediately, and then the air valve should be closed; when the tube-type experimental furnace is working, the parts should be dropped or the wedge-shaped door switch should be stopped, and the feed should be stopped. Take out the parts.

    https://songdaokeji.cn/


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan