Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Large AC Motors Terminal Rings

    Electric Motor Rotor Bars and

    Medium-frequency welding of mo

    Medium-Frequency Brazing Equip

    Integral Brazing Process for t

    Online Heating Equipment for T

    Online Heating Equipment for A

    Aluminum ingot heating equipme

    Welding Equipment for Traction

    Fully Digital Medium Frequency

    Motor rotor end ring brazing e

    Motor Rotor Guide Bar Welding

    Brazing equipment for hydro ge

    Generator rod induction brazin

    Hydropower generator stator ba

    Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Electric furnace principle(原理)
        

    The cooling water temperature is too high

    (1) The sensor cooling water pipe is blocked by foreign matter, which causes the water flow to decrease and the cooling water temperature is too high. At this time, it is necessary to cut off the power first, and then use compressed air to purge the water pipe to remove foreign objects. It is best not to stop the pump for more than 8 minutes.

    (2) The coil cooling water channel has scale, which causes the water flow to decrease and the cooling water temperature is too high. According to the water quality of the cooling water, the obvious scale on the coil waterway must be pickled in advance every one to two years.

    (3) The sensor water pipe suddenly leaks. This water leakage is mostly caused by the insulation breakdown between the inductor and the water-cooled yoke or the surrounding fixed support. When this accident is discovered, the power should be cut off immediately, the insulation treatment of the breakdown area should be strengthened, and the surface of the leakage area should be sealed with epoxy resin or other insulating glue to reduce the voltage for use. The hot metal in this furnace should be hydrated, and the furnace can be repaired after it is poured. If the coil channel is broken down in a large area, the gap cannot be temporarily sealed with epoxy resin, etc., so the furnace has to be shut down, molten iron is poured, and repaired.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan