E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
1.5T aluminum shell hydraulic melting furnace
First, the complete set of equipment:
The system includes: an electric furnace 1 .5 t; a 1500 KW SCR frequency power; a rectifier transformer owned 1 600 KVA (10KV / 2 * 750V); a control box furnace convenient operating. A total of one set.
Second, equipment technical parameters:
1, medium frequency power supply
Serial number |
project |
unit |
parameter |
Remarks |
1 |
Transformer capacity |
KVA |
1 600 |
all bronze |
2 |
Transformer primary voltage |
KV |
10 |
|
3 |
Transformer secondary voltage |
V |
2* 75 0 |
|
4 |
Rated melting power |
Kw |
150 0 |
|
5 |
Rated frequency |
Hz |
500 |
|
6 |
Rectifier string |
|
12 pulses |
|
7 |
Inverter |
|
SCR parallel |
|
8 |
Power conversion efficiency |
|
0.97 |
|
9 |
Power factor |
Cos〉 |
> 0.92 |
Under rated power |
10 |
Constant power output time |
|
> 90% |
Within the melting cycle |
11 |
Start success rate |
|
100% |
|
2, induction furnace body
Serial number |
project |
unit |
parameter |
Remarks |
1 |
Rated Capacity |
t |
1 .3 -1. 5 |
|
2 |
Induction ring diameter |
Mm |
7 6 0 |
Can be customized according to customer requirements |
3 |
Loading height |
Mm |
1100 |
Can be customized according to customer requirements |
4 |
Lining thickness |
Mm |
90-120 |
Can be customized according to customer requirements |
5 |
Rated operating temperature |
<C |
1580 |
Determined by the lining material |
6 |
Melting rate (1550 < C) |
t/h |
−1. 7-2T |
(hot state) |
7 |
power consumption |
KWh/T |
About 550-600 |
Error \5% |
Equipment configuration list and price
|
name |
model |
Simple configuration |
Quantity |
Power section |
12 pulse 800V IF power cabinet |
KGPS12-900-0.5S |
KP1000A/3600V platform KK1 5 00A/2500V platform Open DW15-1000A 2 sets All outlets with temperature monitoring |
1 set |
capacitor bank |
DR-900 |
Meet 1 5 00KW use |
1 set |
|
Furnace section |
Steel shell body |
GW- 1. 5 T |
The yoke height is 1.2 meters Induction ring inner diameter 7 6 0mm Waterway with temperature control Leaky furnace alarm |
1 set |
Reducer |
531 |
With bridge |
1 set |
|
Water cooled cable |
DH-SL-400 |
|
1 set |
|
Cooling Tower |
Power water cooling system |
BN- 10 0T |
|
1 set |
Furnace water cooling system |
BN- 5 0T (dual pump) |
|
1 set |
|
transformer |
|
|
Bring your own |
|