E-Mail: firstfurnace@gmail.com
whatsapp:+86 13015583380
Adress: Luoxin Industrial Park, Luoyang, HenanLarge diameter steel pipe quen
Piston rod quenching and tempe
Grinding rod quenching and tem
induction heating machine 
High frequency induction heate
Quenching equipment for machin
Round steel end heating furnac
Steel pipe heat treatment prod
Square steel quenching and tem
Sucker rod quenching and tempe
Thickened petroleum steel pipe
Round steel quenching and temp
Steel pipe quenching and tempe
Steel plate quenching and temp
Induction Hardening Machine&nb
Flywheel ring gear high freque
R6m 80-150 mm square billet continuous casting machine detailed solution
Name |
Quantity |
Size |
|
Note |
|
Main Machine |
1) Crystallizer |
3 |
900*800*600 |
|
|
2)Vibration mechanism and main frame |
1 |
6500*2100*2100 |
|
||
3)R6m curved track |
1 |
7600*1200*500 |
|
||
4) Straightening machine |
|
2800*1600*900 |
Double hydraulic cylinder, double motor, arc tooth turbine drive |
||
5)Starter track and storage device |
1 |
11400*1300*600 |
Can be transported separately |
||
6)Steel billet cooling sprinkler system |
|
|
|
||
7)One power distribution cabinet,one frequency conversion cabinet and one manual control box. |
|
|
|
||
8)Flexible spindle |
1 |
11180*150*150 |
|
||
Work platform 7000*6000*mm, the seller provides reference drawings. |
|||||
150mm steel billet four-column hydraulic online shearing machine |
1)Main machine |
1 |
2500*800*700 |
Mechanical length: 7.5 |
|
2)Pumping station |
1 |
1800*1500*1200 |
|||
150 mm long 6m billet collector |
|
1 |
6500*1400*600 |
4.5 |
Double hydraulic |
Walking trolley |
|
1 |
2500*1300*1000 |
1.8 |
motor driven |
1.5 tons tundish |
|
1 |
1500*800*700 |
0.45 |
|
5 tons of shaker |
|
1 |
|
1.5 |
|
Water pump and accessories |
|
1 |
|
2.0 |
Contains starter cabinet, no pipe |
Total price:$87,000 |
|||||
(1)If the voltage and frequency requested by the purchaser do not match the Chinese standard, an additional conversion fee will be charged, and the fee will be negotiated by both parties. (2)The seller of this equipment can arrange 1-2 technicians to guide the installation at the user's country. (3)The cost of arranging technicians to install equipment abroad and the cost of round-trip airfare and accommodation are borne by the buyer. |