Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace technical information£¨¼¼Êõ£©
        

    Repair and maintenance of induction melting furnace lining

    When longitudinal cracks appear in the furnace wall, slow heating should be adopted to make the cracks close before melting.

    When a transverse crack occurs in the furnace wall, fine powder refractories can be filled in the transverse cracks according to the actual situation, and then the charging melting is carried out.

    When the bottom of the induction furnace is corroded, the lining can be repaired, and then covered with iron plate after repair, and then melted at low power for a period of time and then melted at full power.

    The maintenance and maintenance of the lining is generally carried out in the case of a cold furnace. The furnace should be cooled by natural cooling or water cooling system, and water cooling is not allowed.

    After the smelting is finished, the molten iron is cleaned. In order to prevent cracks on the furnace wall, an asbestos board should be added to the furnace mouth for heat preservation.

    If the induction melting furnace is shut down for a long time, it should be slowly heated and melted at the next opening, so that the fine cracks in the charge are self-healing.

    www.firstfurnace.com

    www.tecfurnace.com

    www.songdaofurnace.com


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan