Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace industry news£¨µç¯ÐÂÎÅ£©
        

    Green energy saving and environmental protection 1 T intermediate frequency furnace the most detailed configuration technical parameters

     

    First, 1 T intermediate frequency furnace configuration:

    Serial number

    name

    Technical Parameters

    Remarks

    1

    capacity

    1. Rated capacity 1T ; 2. Maximum capacity 1.3T

     

    2

    Induction coil

    1. Diameter 700mm 2. Weight: 140KG

    3. Material: T2 copper 4. Shape: Rectangle

    ``

    3

    Lining thickness

    80~100mm

     

    4

    Operating temperature

    1650 ¡ã C

     

     

    IF power phase

    6 veins

     

    5

    Melting rate

    ¡Ý1T/h

     

    6

    Power consumption

    <650kwh/T

     

    7

    Working noise

    <50 decibels

     

    8

    rated power

    750KW

     

    9

    IF frequency

    1000HZ

     

    10

    Rectified phase number

    6 veins

     

    11

    DC voltage

    920V

     

    12

    DC

    1000A

     

    13

    IF voltage

    1200V

     

    14

    Transformer capacity

    KVA

     

    15

    Transformer primary side line voltage

    10 KV

     

    16

    Transformer secondary side outlet voltage

    660V

     

    17

    Inlet pressure

    1. Power cabinet 0.2Mpa 1. Furnace body 0.2Mpa

     

    18

    Inlet temperature

    1. Furnace body 35 ¡ã C; 2. Power cabinet 35 ¡ã C

     

    19

    Effluent temperature

    1. Furnace body 50 ¡ã C; 2. Power cabinet 50 ¡ã C

     

    20

    Cooling method and

    Flow rate (single unit)

    1. Furnace body:

    2. Power supply cabinet:

    40~50m3/h

     

    twenty one

    Reactor coil

    1. Diameter 220mm 2. Weight: 6.5 KG ¡Á 12

    3. Material: T2 4. Shape: Round

     

    twenty two

    Water cooled cable

    1. Diameter 400mm 2. Weight: 55KG

    3. Material: T2

     

    twenty three

    KK thyristor

    1. Brand: á­·å 2. Parameters: KK1500A/1600V/20us

    3. Quantity 8

     

    twenty four

    KP thyristor

    1. Brand: Yufeng 2. Parameter KP1000A/1600V

    3. Quantity: 6 blocks

     

    25

    Reducer

    1. Model: 431 2. Brand: Jingjiang

     

    26

    Furnace shell

    1. Weight 480KG 2. Thickness ¡Ý 30mm

    2. Material: Aluminum

    3. Quality requirements:

    There should be no air holes, sand holes, lack of meat, etc., which affect the strength performance of the inner and outer surfaces.

     

    27

    Capacitor

    1. Brand: Weiwei or Xin'anjiang 2. Parameter 2000 Kvar

    3. Quantity 8

     

    28

    Connecting copper bars

    1. Thickness 6mm 2. Material T2

     

    29

    Water pipe connection clamp

    Material: Stainless steel

     

    30

    Switchgear

    Brand: Delixi

     

    31

    Power factor

    >0.9

     

    32

    Reactor coil core

    Brand:

     

    33

    Water quality requirements

    PH value 7-8

     

    34

    Cooling system equipment

    A brief description:

     

    35

    protective device

    Overcurrent, overvoltage, current limiting, voltage limiting

     

    36

    Start success rate

    100%

     

     

     


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan