Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • 0.25T Intermediate Frequency F

    0.5T Intermediate Frequency Fu

    Medium Frequency Furnace

    2T Induction Melting Furnace

    1T Induction Melting Furnace

    500kg Induction Melting Furnac

    250kg Induction Melting Furnac

    Induction Melting Furnace

    3 T Induction Melting Furnace

    5T Induction Melting Furnace

    1T One Belt Two Intermediate F

    5T One Belt Two Intermediate F

    3T One Belt Two Intermediate F

    2T One Belt Two Intermediate F

    5T Parallel Intermediate Frequ

    5T Intermediate Frequency Furn

    5T Series Intermediate Frequen

    3T Series Intermediate Frequen

    2T Series Intermediate Frequen

    1T Series Intermediate Frequen

    0.5T Series Intermediate Frequ

    0.25T Series Intermediate Freq

    1T Parallel Intermediate Frequ

    2T Parallel Intermediate Frequ

    0.5T Parallel Intermediate Fre

    0.25T Parallel Intermediate Fr

    Parallel Intermediate Frequenc

    3T Intermediate Frequency Furn

    Electric furnace repair
        

    Induction melting furnace copper row repairing method

     

    1. Inductive melting furnace is inadvertently operated when pouring, or the nozzle is too short, and the splashing iron adheres to the copper row to burn through;

    2. After the induction lining furnace lining is burned through, the molten iron overflow causes the copper platoon to burn through. After the copper platoon is burnt through, the cooling water will overflow and must be immediately repaired. Since the copper bars are installed in the furnace shell, the welding repair is inconvenient and needs to be removed and removed during the repair. Jiuli believes that the previous copper platoon repair process has to waste at least one lining, which is quite time consuming. Here is a sticky method for everyone to save maintenance costs. For the first reason, the copper row burns through, and the furnace can be temporarily shut down. At the same time, the copper piece of 1~2mm thickness is cut into small pieces, the area should be slightly larger than the area of the copper discharge crack, and then removed by saw blade or hand grinding wheel. The residue of the copper platoon is burnt and cleaned with sandpaper, and the shaped epoxy resin is quickly mixed with the curing agent, and the trimmed copper piece is stuck in the copper row cracking place, and after a few minutes, the epoxy resin is solidified. A high copper bond strength is formed and the furnace can be re-opened. For the second reason caused by the copper row burn through, the repair process is as follows: tilting the furnace iron stopping the furnace repairing the furnace lining copper row bonding + opening furnace. This repair process also saves a lining and a large amount of man-hours and oven power compared to conventional weld repairs.


    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan