Contact
Tel: 18037961302
Sales hot line ( 24 hours  service): 18037961302

E-Mail: firstfurnace@gmail.com

whatsapp:+8618037961302

Adress: Luoxin Industrial Park, Luoyang, Henan
  • Products
  • Gear hardening machine

    Large diameter steel pipe quen

    Piston rod quenching and tempe

    Hand-held induction heater

    Grinding rod quenching and tem

    Induction forging machine

    induction heating machine 

    Induction heater

    High frequency induction heate

    Super audio induction heating

    Super audio induction heating

    Guideway quenching integrated

    Quenching equipment for machin

    Round steel end heating furnac

    Steel pipe heat treatment prod

    Square steel quenching and tem

    Sucker rod quenching and tempe

    Thickened petroleum steel pipe

    Round steel quenching and temp

    Steel pipe quenching and tempe

    Steel plate quenching and temp

    Induction Hardening Machine&nb

    Flywheel ring gear high freque

    Oil drill pipe quenching and t

    Iron induction furnace

    Aluminum melting furnace

    Copper melting furnace

    Small steel melting furnace

    Electric furnace principle£¨Ô­Àí£©
        Emergency plan for induction melting furnace
    A. Emergency plan for water cut
    The induction melting furnace suddenly stops water, and the circulating water pressure gauge of the melting furnace sends a signal to automatically cut off the intermediate frequency power supply and send out an alarm signal. The workers in front of the furnace should take the following emergency measures:
    1. Cut off the main circuit according to the power-off sequence of the melting furnace (to prevent the intermediate frequency power supply from restarting when the water pressure suddenly returns to normal, and the intermediate frequency current impacting the thyristor). To
    2. Close the main water inlet valve of the cooling water system first, and then open the standby fire-fighting water valve to ensure that the coil cooling water supply pressure is 0.1-0.16Mpa. 3. Cover the furnace mouth with asbestos cloth and do a good job of heat preservation. To
    4. The monitor on duty is responsible for notifying the dispatcher and workshop director in time. The monitor can find out the reason and restart the induction melting furnace according to the operating procedures after the normal water supply is restored. To
    B. Emergency plan for power outage
    Emergency measures for sudden power failure of induction melting furnace:
    1. Check whether the cooling water of the coil is normal. If it is abnormal, deal with it according to the emergency plan for water cut to ensure that the cooling water is normal. To
    2. Inform the dispatcher, the workshop director, and the monitor to understand the reason and time of the power outage, and then take the following measures:
    ¢ÙWithin 4 hours of power failure, cover the furnace mouth with asbestos cloth, do a good job of heat preservation, and use 200KW of power to melt after returning to normal. To
    ¢ÚIf the power is cut for more than 4 hours, in order to avoid the molten iron in the furnace from solidifying and damaging the furnace lining, all the molten iron should be poured out, and the asbestos cloth should be used for heat preservation. Only after the fault is eliminated, can the material be added and the furnace should be restarted. To
    ¢ÛIf the control power supply is also out of power and the molten iron cannot be poured out, heat preservation work should be done until the normal power is supplied according to the operating rules, and the temperature is raised with 100KW power to make the furnace temperature above 900¡æ, and then use 200KW power, slowly Melt the molten iron (to prevent the molten iron from cracking the furnace lining when melting with high power). To
    ¢ÜObserve the change of the furnace lining after the production of molten iron in this furnace. If the furnace lining has a large worn surface, stop using it and repair or dismantle the furnace lining. To
    ¢ÝFor melting furnaces that have experienced power outages, the furnace front workers should strengthen monitoring. First, they must manually test whether the alarm system is normal, and compare the alarm coefficient with that before the accident. When the alarm coefficient has increased significantly, the furnace can be replaced. Production. To
    C. Emergency plan for power outages and water outages
    When the induction melting furnace has a power outage or water outage, the principle of first ensuring that the coil cooling water is normal, and then treating the molten iron. To
    1. Follow the emergency plan for water cut to ensure that the coil cooling water is normal. 2. Dispose of molten iron according to the emergency plan for power outages. To
    D. Emergency plan for furnace leakage
    Emergency measures for leakage of induction melting furnace:
    1. When the leaking furnace alarm sends out a signal to confirm the leaking accident, emergency measures when the molten iron does not leak out:
    ¢Ù Cut off the main power supply (at the same time, the class leader informs the dispatcher, workshop director, and class leader). To
    ¢ÚPour molten iron into the emergency bunker in time. To
    ¢ÛKeep the coil cooling water unblocked. To
    2. Emergency measures when a furnace leakage accident occurs and a water shutdown accident occurs at the same time:
    ¢Ù Cut off the main power supply (at the same time, the class leader informs the dispatcher, workshop director, and class leader). To
    ¢Ú Pour molten iron into the emergency bunker. To
    ¢ÛAccording to the emergency plan for water cut, use the standby water to ensure that the coil is supplied with cooling water. To
    ¢ÜThe production team assists in blowing the furnace with air ducts to reduce the furnace temperature as soon as possible. To
    3. Emergency measures for water leakage in the coil when a furnace leakage accident occurs:
    ¢Ù Cut off the main power supply (at the same time, the class leader informs the dispatcher, workshop director, and class leader). To
    ¢ÚClose the circulating water inlet valve to prevent molten iron from leaking out and exploding when exposed to water. To
    ¢ÛPour molten iron into the emergency bunker. To
    ¢ÜThe production team assisted in blowing the furnace with air ducts to reduce the furnace temperature, and arranged for personnel to use fire extinguishers to extinguish the open flame at the bottom of the furnace. To
    ¢Ý Recirculate water, cool the coil, and place a bucket to catch the water at the coil's water seepage position.

    Copyright© 2007-2013 songdao Electric furnace manufacturing Co,.Ltd All Rights Reserved
    Tel:18037961302 Sales hot line ( 24 hours service): 18037961302
    E-Mail:firstfurnace@gmail.com
    Adress: Luoxin Industrial Park, Luoyang, Henan